Projects

York Township Salt Dome

Deep Foundation
  • 40+ Shell Piles Installed
  • 60'+ Piles

View Project

Winnetka Bluff Restoration

Deep Foundation
  • Installed 88 Helical Piers
  • First Helical Job Constructed at Winnetka Beach
  • Performed on a Steep Bluff

View Project

Walgreen’s Skywalk Addition

Deep Foundation
  • Value Engineered the Project Reducing Drilling Time
  • Tight Site with Active Foot and Vehicle Traffic
  • Over 60 Caissons Installed

View Project

United Airlines Hangar

Deep Foundation
  • Over 200+ H-Piles Installed
  • Piles Over 70'+ Deep
  • 15,900 Feet of Pile Installed

View Project

Spirit Airlines – Concourse G & L Gate Swap

Deep Foundation
  • Drilled 4 Shafts for a Passenger Walkway
  • Cored Through Obstructions at Every Shaft
  • Mobilized and Operated in an Active Airport

View Project

Lathrop Homes

Deep Foundation
  • 30,000+ SF of Sheeting Installed
  • 44 Belled Shafts Drilled
  • 55 Soldier Piles Installed

View Project

CDOT Washington & Wabash CTA Station

Deep Foundation
  • 135 Micropiles Installed
  • 170 Soldier Piles Installed
  • 1000'+ of Waler Installed

View Project

CDOA Midway Passenger Security Checkpoint Expansion Project

Deep Foundation
  • $1 Million+ in Value Engineered Savings
  • 75 Caissons Drilled
  • 62 Micropiles Installed

View Project

318 N. Carpenter

Deep Foundation
  • 3 Level Earth Retention System
  • 40 Caissons Installed
  • 16,000+ SF of Sheeting Installed

View Project

1122 W. Chicago

Deep Foundation
  • 58' Deep Caissons
  • Installed Sheet Piles to Support CTA Structure
  • 50 Belled Caissons Drilled

View Project

1000M, 1000 S. Michigan

Deep Foundation
  • O-Cell Test Performed
  • Deep Foundation for 74 Story High Rise
  • Rock Drilling Over 100' Deep

View Project