Salt Creek Intercepting Sewer
scope of work
- 7 Access Shafts Drilled
- Over 200' of Access Shafts Installed
- Up to 12' Diameter Holes
- Rock Drilling Required
SERVICES
Earth Retention
WORK COMPLETED
August 2017
Project Summary
Stalworth's scope consisted on drilling 12'-0" and 7'-0" diameter shafts to the top of the existing sewer, setting a full length CMP a foot smaller than the shaft diameter and finally grouting the annulus. The drop shafts ranged from 6'-0" to 11'-0" in diameter and from 26'-0" to 30'-0" deep in rock. These would allow Kenny Construction access to the existing sewer for repair work.