scope of work
- Nearly 1,300 SF of Retained Cantilevered Excavation
- Cantilever Depth up to 13'
- Pump Truck and Bucket Technique Needed to Fill Shafts
- Steep Site Access
SERVICES
Earth Retention
WORK COMPLETED
May 2021
Project Summary
Stalworth was brought on this job to drill soldier piles to allow for the excavation and construction of a new culvert. The project was located down a steep ravine, which created some challenges accessing the job site and led to some unique solutions. One of which was using a pump truck and bucket at times to fill the shafts since the entrance was such a steep slope. In the end 15 soldier piles designed to handle a 13' cantilever cut were installed.