Walden Ravine

scope of work

  • Nearly 1,300 SF of Retained Cantilevered Excavation
  • Cantilever Depth up to 13'
  • Pump Truck and Bucket Technique Needed to Fill Shafts
  • Steep Site Access

SERVICES

Earth Retention

WORK COMPLETED

May 2021

Download Project Page

Project Summary

Stalworth was brought on this job to drill soldier piles to allow for the excavation and construction of a new culvert. The project was located down a steep ravine, which created some challenges accessing the job site and led to some unique solutions. One of which was using a pump truck and bucket at times to fill the shafts since the entrance was such a steep slope. In the end 15 soldier piles designed to handle a 13' cantilever cut were installed.

Prev Project Mutual Fuel Gas Works MGP
Back To All
Next Project Winnetka Bluff Restoration