West Branch Grand Calumet River Remediation

Hammond, IN

  • 10,250 SF of Sheet Pile Wall

425 WF of sheeting on four different walls were installed to cut off the flow of the Grand Calumet River in order to excavate, remove and replace contaminated soil in the river bottom.

For this job a 200 ton crane with a suspended vibratory hammer was utilized to drive the sheet piling.  The large crane enabled us to install the work on the far side of the river without floating equipment.

 

Construction Type: