Cermak CTA Station

Chicago, IL

  • 249 Micropiles

In an effort to increase public transportation access to McCormick Place and the future DePaul Basketball Stadium, the City of Chicago planned a new elevated CTA Station on the Green Line at Cermak & Wabash. Stalworth Underground designed and installed 249 100-foot long micropiles for the new station houses and platforms. The micropiles included 7' long rock sockets and were constructed under the existing CTA elevated track structure.

Construction Type: